warning: Creating default object from empty value in /data/sites/web/protrackbe/subsites/pmknowledgecenter.be/modules/taxonomy/taxonomy.pages.inc on line 34.

lower bound

Heuristic project scheduling: Validating the quality of a project schedule

Project scheduling is the act of constructing a timetable for each project activity, and differs in complexity due to the presence of renewable resources with limited availability. The construction of a resource feasible project schedule within the restrictions of a limited availability of renewable resources can be done to optimize a predefined scheduling objective (see “Resource constrained project scheduling: What is my scheduling objective?”). In this article, the differences between three possible schedules that can be constructed from project network data are described, as follows: 

What is my scheduling objective? Lower bounds on the total project duration

Minimizing the total duration of a resource-constrained project is often a generally accepted project scheduling objective (see “What is my scheduling objective? Minimizing the project lead time”). However, optimizing a scheduling objective within the presence of limited renewable resources often requires software algorithms. In this article, three lower bound calculations will be discussed, as follows: 

© OR-AS. PM Knowledge Center is made by OR-AS bvba | Contact us at info@or-as.be | Visit us at www.or-as.be | Follow us at @ORASTalks